Current User: Home Biznet Menu Log In/Out
SCP Solicitation Details
State Contracting Portal Solicitation Details

Organization Cromwell, Town of
Project/Solicitation # 2019-2-CROM
Solicitation Type Invitation to Bid
Due Date 08/21/2019
Includes SBE/MBE Requirements NO
Qualified Partnership NO
Summary COLES ROAD RECONSTRUCTION PHASE 3

Contact Name Jon Harriman, P.E.
E-Mail jharriman@cromwellct.com
Phone (860) 632-3465
FAX (860) 632-3477
WebSite www.cromwellct.com

Additional Description The project involves the reconstruction of approximately 3,061 linear feet of Coles Road between Route 9 and Route 3 with minor horizontal and vertical realignment, widening of the roadway, installation of bituminous concrete lip curbing, construction of an 80-foot-long retaining wall and construction of concrete sidewalk on one side of the road throughout the length of the project and significant excavation and lining with riprap the adjacent slope. Drainage work includes: installation of drainage facilities including approximately 27 storm drainage structures, approximately 1,190 linear feet of 12 in. to 36 in. reinforced concrete pipe, 800 linear feet of 15 in. to 24in. high density polyethylene pipe and approximately 2,200 linear feet of 6-inch underdrain.

Documents

Conference Date 8/2/2019 10:00:00 AM
Address 41 West Street
Cromwell, CT 06416
Instructions Town of Cromwell Public Works Department
Map Link
Hit Counter 21,022,355