|
|
Organization |
TEAM, Inc. |
Project/Solicitation # |
50 |
Solicitation Type |
Request for Proposal |
Due Date |
04/10/2019 |
Includes SBE/MBE Requirements |
NO |
Qualified Partnership |
NO |
Summary |
REHABILITATION OF CORRIDOR FLOORS |
|
|
|
|
|
|
Contact Name |
Ed Leavy |
E-Mail |
edwrdlvy@sbcglobal.net |
Phone |
(203) 929-0546 |
FAX |
(203) 736-5425 |
WebSite |
|
|
Additional Description |
The work involves the replacement of the tile surface in the corridors of the bottom floor, also called the lower floor. The work shall include but not be limited to all material, labor, equipment and items of work necessary to complete the project. An outline of the work involved is:
• Remove and dispose of lockers in corridor.
• Remove existing tile and cove molding from floors, clean and repair surface, install leveling course where needed.
• Install new VCT and cove molding.
• Clean and wax floors
• Repair any damage to walls or adjacent surfaces resulting from removal and replacement of old tiles.
|
|
Documents |
|
|
|
Conference Date |
4/2/2019 06:00:00 PM |
Address |
25 Rumford Street Waterbury, CT 06702 |
Instructions |
A site visit is mandatory for the submission of a proposal. Site visit will be conducted on April 2, at 6:00 pm. |
Map Link |
|
|